01

Information to prepare

Available drawings, occupancy details, operating processes, stored materials, utility information and known system issues help the survey begin efficiently.

02

What the engineer observes

Access, escape conditions, hazards, water and power arrangements, installed systems, serviceability and building changes are reviewed in context.

03

What should follow

The survey should produce clear observations, priorities and a practical basis for design, testing, corrective work or maintenance planning.