Installed once.
Kept ready continuously.

Fire protection is not complete at handover. Planned care helps reveal deterioration, operational changes and unresolved faults before they weaken readiness.

Inspect. Test.
Correct. Record.

The exact maintenance plan depends on the installed systems, site conditions, operating schedule and agreed service scope.

01

Inspect

Review visible condition, accessibility, indications, controls and changes that may affect protection.

02

Test

Functionally exercise agreed pumps, valves, alarm devices, circuits and system interfaces.

03

Correct

Identify faults clearly, prioritise corrective work and verify completed actions.

04

Document

Maintain practical service records, observations, readings and outstanding-action visibility.

Readiness across
the system lifecycle.

  1. Preventive maintenance planning
  2. Pump, valve and water-system checks
  3. Alarm and detection functional testing
  4. Safety-equipment inspection and servicing
  5. Fault identification and corrective recommendations
  6. Periodic records and readiness reporting

Discuss the systems installed at your site.

Talk to Mercury